Alexandria Waste Water Treatment Plant

Alexandria Waste Water Treatment Plant

 

Location: Alexandria, Egypt Employer: Egyptian Government Consultant: Stanley Consultants Inc.
Contractor: ABB SUSA, Inc. Project Start Date: 10/1/2001 Project End Date: 3/1/2003
Scope Duration (Months): 17 Scope: 1- Structural Shop Drawing
 
Stop Slideshow
Start Slideshow
Refresh