Latest Post
Introduction This paper highlights both the concepts and the precautions that should be considered during the plan of BIM projects workflows. Also, it describes the decomposition of BIM models into 3D ...
Blog Posts
The Julius Nyerere Hydropower Project is developed for Power Generation and Irrigation Flow, with a total installed capacity and annual power generation of 2,115MW and 6,307GWh respectively. The ...