Julius Nyerere Hydroelectric Dam / Talent Current Project
The Julius Nyerere Hydropower Project is developed for Power Generation and Irrigation Flow, with a total installed capacity and annual power generation of 2,115MW and 6,307GWh respectively. The normal operation level of the reservoir is 184.0m.a.s. l. The Project layout consists mainly of: Roller Compacted Concrete (RCC) Gravity Dam, Main Spillway on the main Dam. …
Julius Nyerere Hydroelectric Dam / Talent Current Project Read More »